PROCEDURE QUALIFICATION RECORD (PQR)

After the approval of the WPS summary, the welding engineer shall proceed with the welding procedure qualification. The welding engineer shall arrange for the raw materials, welding consumables, welders, NDT subcontractor and TPI. The welding engineer also shall arrange for the mechanical testing of a test coupon at a client-approved lab.

34 Handbook of oil and gas piping

Calibrated Instruments Required Prior to PQR Welding

  1. AC/DC digital clamp meter (min. 2–3 nos.)
  2. Digital infrared thermometer (min. 2–3 nos.)
  3. Digital vernier caliper (1 no.)
  4. High/low gauge (1 no.)
  5. Weld inspection gauge (1 no.)
  6. Stop watch (2–3 nos.)
  7. Steel measuring tape (5 meters) (2 nos.)

Equipment/Instruments to be Calibrated Prior to PQR Welding

  1. Welding machines
  2. Electrode baking oven
  3. Electrode holding oven
  4. Flux holding oven
  5. Electrode quivers
  6. Argon gas regulators