STORAGE AND HANDLING
a) Storage and Handling of Materials Procured by PCR
All project-related permanent materials and consumables, like welding electrodes, paints, etc., shall be stored separately and in accordance with client/manufacturer’s recommendations.
b) Storage and Handling of Client-Supplied Material
All client-supplied materials shall be segregated, identified and stored properly in a secured area.
Storage and Handling Activity – DOs and DON’Ts
| DOs | DON’Ts |
|---|---|
| All piping materials shall be stored at elevated level (not touching the ground). | Don’t store the pipes and fitting materials directly on the ground. |
| Check for the end covers on the pipes. | Don’t mix CS, LTCS, SS and DSS materials during storage. |
| Check for the protection of flange faces. | Don’t store materials, like valves, flanges, bolts, studs, etc., in open storage areas. |
| Check for the end covers of valves. | |
| Ensure the stainless steel materials are stored separately and protected properly. | |
| Ensure the GRE materials are stored strictly as per vendor recommendation. |