📚

Introduction

Overview of pre‑commissioning process and scope.

Open section →
🚶

Line Walk

Checking installed piping against drawings and specs.

Open section →
📝

Punch List

Recording outstanding items before handover.

Open section →
📦

Test Pack / ITRs

Inspection and test reports compilation.

Open section →
🔍

NDT Clearance

Ensuring welds pass non‑destructive testing.

Open section →

Punch List Closing

Verification and closure of pending punch items.

Open section →
🗂️

Test Pack Approval

Client/QA approval of inspection documents.

Open section →
💧

Release for Pressure Test

Authorization to begin hydro/pneumatic testing.

Open section →
📜

Regulatory Approval

Compliance with statutory and client requirements.

Open section →
🧪

Pressure Testing

Hydrostatic or pneumatic test execution.

Open section →
💦

De‑watering

Removing water post‑testing to prevent corrosion.

Open section →
🔧

Reinstatement

Restoring systems after testing activities.

Open section →
🛡️

Preservation

Protecting piping until commissioning.

Open section →
🔢

Line Numbering

Identification and tagging of piping lines.

Open section →
🔩

Bolt Tightening

Flange management and torque control.

Open section →
🎨

Paint Touch‑up

Final coating repairs and touch‑ups.

Open section →
🧊

Insulation

Thermal and acoustic insulation application.

Open section →
🧭

Summary

Key steps, risks, and expectations.

Open section →